Profile Build Group were engaged to complete maintenance works to the Southbank Piazza due to general deterioration from weather and age.
The repairs conducted were as follows:
- Sanding and degreasing all existing steel work
- Rust conversion
- Preparing and painting the entire metal structure with a two-pack high performance epoxy designed for industrial and marine environments that are susceptible to UV exposure and the elements
The works were completed after hours to minimise disruption.