Profile Build Group | Taringa, QLD – Fire Damage Claim
740
portfolio_page-template-default,single,single-portfolio_page,postid-740,ajax_fade,page_not_loaded,,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-10.1.1,wpb-js-composer js-comp-ver-5.0.1,vc_responsive
 

Taringa, QLD – Fire Damage Claim

Taringa, QLD – Fire Damage Claim

Profile Build Group were engaged to perform an emergency make safe due to a fire within a unit complex as a result of an electrical appliances. The following repairs were conducted to make safe:

  • Electrical disconnect throughout the unit
  • Removal all fire damage surfaces to all rooms, including wall and ceiling linings, appliances, doors and kitchen and bathroom fixtures
  • Cleaning and deodorising of all frame work
  • Replacement of security screens to make safe
  • Removal of all fire and smoke damaged debris from site
Category
Make Safe