Chermside, QLD – Break & Enter

Profile Build Group were engaged to attend to an emergency Make Safe after a break and enter. After police attended, our team attended site as a matter of urgency and completed the following; Attended site to board up the opening to secure the property as temporary measure Organised Fire Door supplier to attend site, supply, […]

Northern NSW – Storm Damage

Profile build Group were engaged to attend site to conduct an emergency Make Safe after high forced winds removed metal roof sheets during a storm causing water ingress through the ceiling below. Profile Build Group’s team attending site to complete the following Make Safe Repairs: Electrical disconnect throughout the affected areas Tarping of the roof […]

South Bank, QLD – Mould Damage Claim

Profile Build Group were engaged to remediate severe mould to all affected areas of a unit, after a water leak had occurred. We applied an anti-microbial solution to all areas, removed water damaged wall and ceiling linings where required, provided drying to all timber framing and concrete sub floor.

Corinda, QLD – Impact Damage Claim

Profile Build Group were engaged to complete an emergency make safe after a vehicle had impacted both the front roller door and exited the rear solid wall in a garage. The following was completed: Immediate attendance to site to assess the scene and make a plan of works Carpenters – Boarded up the walls using […]

Mount Gravatt, QLD – Water Damage Claim

Profile Build Group were engaged to conduct a make safe following water ingress as a result of a blocked drain to a rooftop terrace BBQ area. Water cascaded down the lift shaft, causing damage to common area hallways throughout the entire building. Unblock the drain to the rooftop terrace BBQ area Perform electrical make safe, […]

Taringa, QLD – Fire Damage Claim

Profile Build Group were engaged to perform an emergency make safe due to a fire within a unit complex as a result of an electrical appliances. The following repairs were conducted to make safe: Electrical disconnect throughout the unit Removal all fire damage surfaces to all rooms, including wall and ceiling linings, appliances, doors and […]

South Brisbane, QLD – Sewerage

Profile Build Group were engaged to conduct an emergency make safe following a blocked waste pipe which as a result flooded two units and common area hallway with raw sewerage. The following was conducted to make safe: Extraction of raw sewerage to all areas Removal of blocked and damaged plumbing Removal of carpets, floor coverings, […]

Mount Isa, North QLD – Storm Damage Claim

Profile Build Group were engaged to conduct a make safe following the weather event that affected Mount Isa and Townsville in February 2019. The following repairs were conducted: Electrical disconnect of water affected items Fire system repairs Mould remediation Removal of water damaged ceiling linings Cleaning of carpets and floor coverings Make safe to poker […]