Profile Build Group | Arana Hills, QLD – Concrete Path Replacement
654
portfolio_page-template-default,single,single-portfolio_page,postid-654,ajax_fade,page_not_loaded,,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-10.1.1,wpb-js-composer js-comp-ver-5.0.1,vc_responsive
 

Arana Hills, QLD – Concrete Path Replacement

Arana Hills, QLD – Concrete Path Replacement

Profile Build Group were engaged to replace a shopping centre paved pathway with a concrete pathway due to damage caused from age, wear and tear and general earth movement.

The following was involved to remediate this damage:

  • The site was secured with temporary fencing, and the works conducted in stages to ensure no disruption to the businesses
  • Earthworks were completed
  • The existing pathway and stairs pavers were removed and disposed of
  • The concrete pathway, including formwork, was completed
Category
Body Corporate