Profile Build Group were engaged to repair and restore the Airlie Beach clock tower. The repairs involved:
Sanding and degreasing all existing steel work
Rust conversion
Preparing and painting the entire metal structure with a two-pack high performance epoxy designed for industrial and marine environments that are susceptible to UV exposure and the elements